Project Background

A major coastal grain logistics hub in North China expanded its terminal capacity with 18 new 10,000-ton concrete silos (adding 180,000 tons of capacity) and a 1,200 t/h vessel unloading line. The expansion required an ultra-high-capacity, heavy-duty bulk handling and dust control system.

Core Solution

GSS deployed a complete automated, ultra-high-capacity heavy-duty bulk handling and environmental dust control package custom-engineered for bulk grain processing. The equipment included GSS 1,200 t/h high-capacity heavy-duty bucket elevators for vertical conveying between transfer towers and silos, paired with a customized system-wide dust extraction package covering inlet and outlet ports, transfer points, and conveyor galleries.

Project Value

The 1,200 t/h single-unit throughput seamlessly matched the port's dual-line unloading capacity for 24/7 heavy-duty operation. Low-breakage conveying preserved grain quality. System-wide dust collection suppressed airborne particulate to meet strict coastal environmental regulations.

Client Profile: A Major Coastal Grain Logistics Hub in North China

Located at a strategic deep-water port in North China, Lanshan (Rizhao)Terminal is a national logistics hub for bulk grain receiving, storage, and multi-modal distribution. To support the vital national “North-to-South Grain Transport” in China and international agricultural trade, the expansion project involved the construction of 18 concrete silos (180,000-ton total capacity), a dual 1,200 t/h ship unloading line, and a truck loading tower to significantly raise the port’s throughput.

Goals & Challenges: 1,200 t/h Ultra-High Capacity & Coastal Environmental Standards

As a high-throughput grain import and export terminal, the port facility faced a number of common industry challenges during high-speed ship unloading and silo transfer:

  1. 1,200 t/h Ultra-High Capacity & 24/7 Heavy-Duty Reliability: To Match the dual 1,200 t/h ship unloading line, bucket elevators were required to deliver massive throughput with high structural strength and zero-breakdown reliability under round-the-clock continuous operations.
  2. Strict Environmental Dust Extraction Across Open Port Operations: High-speed bulk handling generated substantial dust at receiving pits, discharge chutes, transfer towers, and conveyor galleries. The equipment must effectively collect dust to meet strict port emission standards.
  3. Low Grain Breakage & Reduced Maintenance Costs : Handling fragile agricultural grains at high velocities demanded optimized bucket and chute geometries to minimize grain damage. Robust components reduced O&M expenses.

Customized Solution: High-Capacity Bucket Elevation & Dust Control Package

To meet the stringent operational and environmental requirements of the port expansion project, GSS engineered a custom bulk material handling and dust control solution tailored for processing bulk grain:

  • GSS 1,200 t/h High-Capacity Heavy-Duty Bucket Elevator: The terminal deployed GSS 1,200 t/h bucket elevators to match the port’s dual-line unloading capacity. Built with reinforced steel casings, heavy-duty belts, wear-resistant liners, and optimized inlet and outlet geometries, these elevators achieved smooth, low-breakage vertical transfer between transfer towers and silos under continuous heavy loads.
  • System-wide Port Dust Extraction Package: The terminal installed a customized GSS environmental dust collection system across all dust-generating nodes, including bucket elevator inlets and outlets, transfer chutes, and conveyor galleries. By collecting airborne particles at the source, the system stopped dust leakage and maintained a clean operational environment.

Project Value: Capacity Release, Green Port Compliance, and Low O&M Expenses

1,200 t/h

Seamless Capacity Release for Port Expansion

The GSS 1,200 t/h bucket elevators provided smooth, reliable vertical handling, eliminating transfer bottlenecks and unlocking the full potential of the new 180,000-ton silo complex.

Green

Comprehensive Environmental Dust Control

Dust collection at all transfer points prevented spillage and air pollution, ensuring complete compliance with stringent coastal environmental regulations.

Heavy-Duty Durability

Lowering Long-Term O&M Expenses

Robust, low-maintenance GSS equipment effortlessly withstood harsh port operational conditions, reducing downtime and maintenance costs for multi-modal grain logistics.

“
"Upgrading our coastal grain terminal with 180,000 tons of new silo capacity required bulk grain handling equipment with exceptional throughput and strict dust control. The 1,200 t/h bucket elevators and full dust extraction system provided by GSS have performed brilliantly under continuous 24/7 operations. The elevators serve our high-volume ship unloading lines smoothly with low breakage, while the dust collection system keeps our transfer towers and galleries clean and compliant with environmental standards. GSS has provided reliable technical support for our regional grain logistics hub."
— — Project Management Team, Northern Coastal Port Grain Hub

Build your automated bulk handling system

Tell us about your material, throughput and site constraints — our engineers will scope a tailored solution for you.

We typically respond within 1 business day. Your information is only used to follow up on your inquiry.